295 MWrenewable project
Transmission-line survey for a 295 MW project
Transmission-line survey; certified by the client as “satisfactory and good”.
Foundations set out and built exactly to the drawings, so structures and panels go up without rework. We have marked thousands of solar piles on utility-scale plants.
What’s included
Pile layout, excavation, concreting and level control.
Recent work
295 MWrenewable project
Transmission-line survey; certified by the client as “satisfactory and good”.
14 km33 kV double circuit
Route survey for the solar plant’s 33 kV double-circuit transmission line.
32,000solar piles marked
Total station + DGPS peg marking, alignment and concreting of 3-ft pile foundations.
Questions
Pile points are set out from the approved layout with a total station and DGPS, then pegged and checked for alignment and level before concreting.
Yes — including peg marking for 32,000 solar piles and survey work for a 300 MW SECI solar project in Andhra Pradesh.
Last updated:
Tell us the location, the work and your timeline. We will call you back.