Text size

Solar foundation works

Foundations set out and built exactly to the drawings, so structures and panels go up without rework. We have marked thousands of solar piles on utility-scale plants.

Drawing: Solar foundation works

What’s included

What is included?

Pile layout, excavation, concreting and level control.

  • Pile layout marking
  • Foundation excavation
  • Concreting
  • Alignment & level control
  • As-built survey

Which equipment do we use?

  • Total station
  • DGPS
  • Auto level

What do you receive?

  • Marked pile points
  • Aligned foundations
  • As-built records

Recent work

Which similar projects have we done?

See all
Transmission lineCompleted

295 MWrenewable project

Transmission-line survey for a 295 MW project

Transmission-line survey; certified by the client as “satisfactory and good”.

  • Oriano Clean Energy Pvt Ltd
  • Kurnool, A.P.
  • 2023–24
Transmission lineCompleted

14 km33 kV double circuit

33 kV double-circuit line survey — Project Trinity Solar

Route survey for the solar plant’s 33 kV double-circuit transmission line.

  • SS Infratech
  • Panyam, Kurnool dist., A.P.
  • 2023
SolarWork order · 2024

32,000solar piles marked

Peg marking and concreting for solar pile foundations

Total station + DGPS peg marking, alignment and concreting of 3-ft pile foundations.

  • Unilent Constructions Pvt Ltd
  • Andhra Pradesh
  • 2024

Questions

Frequently asked questions

How are solar piles marked on site?

Pile points are set out from the approved layout with a total station and DGPS, then pegged and checked for alignment and level before concreting.

Do you work on large solar plants?

Yes — including peg marking for 32,000 solar piles and survey work for a 300 MW SECI solar project in Andhra Pradesh.

Last updated:

Need solar foundation works?

Tell us the location, the work and your timeline. We will call you back.

Call nowWhatsApp