295 MWrenewable project
Transmission-line survey for a 295 MW project
Transmission-line survey; certified by the client as “satisfactory and good”.
Route and tower surveys for power lines on solar, wind and hybrid projects — and the foundations for towers, transformers and switchgear that follow.
What’s included
Route, tower and profile surveys, plus foundations.
Recent work
295 MWrenewable project
Transmission-line survey; certified by the client as “satisfactory and good”.
14 km33 kV double circuit
Route survey for the solar plant’s 33 kV double-circuit transmission line.
12.8 km33 kV multi-circuit
Survey for a double-circuit, multi-circuit 33 kV line on a solar + wind hybrid project.
Questions
Surveys for 14 km and 12.8 km 33 kV double-circuit lines and the 295 MW project line in Kurnool district, among others.
Yes — HT line foundations and substation-yard foundations for transformers, CT, PT and VCB equipment.