Text size

Transmission-line surveys & substation works

Route and tower surveys for power lines on solar, wind and hybrid projects — and the foundations for towers, transformers and switchgear that follow.

Drawing: Transmission lines & substations

What’s included

What is included?

Route, tower and profile surveys, plus foundations.

  • Route & corridor survey
  • Tower location & profile
  • Foundation marking
  • Clearance & ROW survey
  • HT line foundations
  • Transformer, CT/PT & VCB foundations

Which equipment do we use?

  • Leica DGPS
  • Total station
  • AutoCAD

What do you receive?

  • Route & profile drawings
  • Tower schedules
  • Marked foundations

Recent work

Which similar projects have we done?

See all
Transmission lineCompleted

295 MWrenewable project

Transmission-line survey for a 295 MW project

Transmission-line survey; certified by the client as “satisfactory and good”.

  • Oriano Clean Energy Pvt Ltd
  • Kurnool, A.P.
  • 2023–24
Transmission lineCompleted

14 km33 kV double circuit

33 kV double-circuit line survey — Project Trinity Solar

Route survey for the solar plant’s 33 kV double-circuit transmission line.

  • SS Infratech
  • Panyam, Kurnool dist., A.P.
  • 2023
Transmission lineCompleted

12.8 km33 kV multi-circuit

33 kV multi-circuit line survey — 975 MW hybrid project

Survey for a double-circuit, multi-circuit 33 kV line on a solar + wind hybrid project.

  • SS Infratech
  • Kodumur, Kurnool dist., A.P.
  • 2024

Questions

Frequently asked questions

Which line surveys have you done?

Surveys for 14 km and 12.8 km 33 kV double-circuit lines and the 295 MW project line in Kurnool district, among others.

Do you also build the foundations?

Yes — HT line foundations and substation-yard foundations for transformers, CT, PT and VCB equipment.

Last updated:

Need transmission lines & substations?

Tell us the location, the work and your timeline. We will call you back.

Call nowWhatsApp